Client

Location

Manchester, England

Project Duration

4 Months

Scope

The existing gas riser system, installed in the 1970s, had become outdated and prone to issues, necessitating a complete replacement. Given the height of the building and the need to ensure continuous gas supply, a complex scaffolding system was required to facilitate the installation process.

High Rise Access scaffolding

Objectives

  • To safely install an access scaffold allowing the client to install a new gas riser system in High-rise tower blocks to replace the outdated infrastructure.
  • Ensure minimal disruption to residents during the installation process.
  • Adhere to stringent safety regulations and standards for working at heights.

Project Scope

Design and Planning
  • Detailed assessment of the building's exterior to determine optimal scaffolding design.
  • Coordination with structural engineers to ensure the scaffolding could safely support workers and materials.
  • Development of a project timeline that minimises disruption to residents.
Scaffolding Installation
  • Erection of scaffolding along the entire height of the building.
  • Incorporation of safety features such as guardrails, toe boards, and netting.
  • Regular safety inspections and maintenance of scaffolding throughout the project duration.

Key Challenges

Height and Accessibility
  • Ensuring safe access to all levels of the tower block for workers.
  • Navigating confined spaces and working around balconies and external fixtures.
Safety Concerns
  • Maintaining stringent safety standards to protect workers and residents.
  • Implementing comprehensive fall protection and emergency response plans.
Resident Disruption
  • Minimising noise, dust, and inconvenience to residents.
  • Ensuring continuous gas supply during the switchover from the old to the new system.

Solutions and Innovations

Advanced Scaffolding Techniques
  • Use of modular scaffolding systems for quick assembly and disassembly.
  • Installation of cantilevered platforms to provide access around obstacles.
  • Integration of scaffolding with existing building structures for added stability.
Safety Measures
  • Installation of debris nets and protective coverings to prevent materials from falling.
  • Continuous monitoring and maintenance of scaffolding to address any safety issues promptly.
Resident Engagement
  • Setting up a project liaison office to handle resident inquiries and complaints.
  • Distributing newsletters and holding informational meetings to keep residents informed.
  • Scheduling noisy and disruptive work during daytime hours when most residents are away.

Outcome

Successful Installation
  • New gas riser system installed without major incidents or delays.
  • Minimal disruption to residents, with continuous gas supply maintained throughout the project.
Enhanced Safety
  • Zero accidents or injuries reported during the scaffolding and installation phases.
  • Compliance with all relevant safety regulations and standards.

Conclusion

The Tower Gas Riser Installation project demonstrated the effective use of scaffolding in a high-rise residential setting. By leveraging advanced scaffolding techniques, rigorous safety protocols, and proactive resident engagement, Stable Scaffolding Ltd. successfully completed the project on time and within budget, setting a benchmark for similar future projects.